Riverton High School in Riverton, Wyoming, is undertaking a significant expansion with the construction of a new 12,924-square-foot auditorium addition. The facility will accommodate 500 seats and feature a full performance stage, public restrooms, and a direct connection to the existing high school building. Strategically located on the north side of the campus near the band and choir classrooms and the main entrance, the new auditorium is intended to enhance the school’s performing arts capabilities.
The project is being delivered through a Construction Manager at Risk (CMAR) process, ensuring close collaboration between the selected contractor and the architectural team throughout design and construction.
