The Walt Sullivan Building, located on the southwest corner of the State Capitol campus in Helena, is undergoing a comprehensive 51,235 square foot MEP system replacement to meet State of Montana High Performance Building Standards and comply with Remote and Office Workplace Study (ROWS) requirements. Originally built in 1959 with a 1972 expansion, the five-story facility serves as the headquarters for the Department of Labor & Industry. This project modernizes the building’s infrastructure through the installation of a new high-efficiency gas-fired boiler plant, a new chilled water plant, and utilizes an active chilled beam terminal unit to provide a high level of thermal comfort to occupants.
The renovation also includes a complete replacement of the electrical system, featuring new power, lighting, and fire alarm systems, alongside a total overhaul of the plumbing infrastructure and fixtures. Specialized upgrades such as new elevator sump pumps and the evaluation of emergency power systems are also included to ensure the building meets modern codes and operational standards.
The design is registered as a LEEDv4 project and is pursuing LEED accreditation. In addition to full mechanical, electrical, and plumbing engineering, the scope of work includes sustainable design consulting, energy modeling, and construction administration services. These upgrades aim to significantly improve the efficiency and life safety systems of this essential state office building.
This project is part of a larger $72 million effort to upgrade three key Capitol Complex buildings including the Metcalf, Walt Sullivan, and Mitchell Buildings.
